LiveElectric buses and cars keep charging, even when the grid is gone.
- 2.5×
- charging power from the same grid connection
- 1 s
- battery and PCS data, cell by cell
- Grid outage
- buses and cars still charge off the battery
Ingro helps businesses and utilities across India deploy battery energy storage systems (BESS) that perform year after year: sized right, integrated end to end and run on Ingro EMS, our made-in-India energy management system. Any battery, any inverter.
LiveElectric buses and cars keep charging, even when the grid is gone.
Four common sources of delay. Each one has an Ingro answer below.
Battery, inverter, controller and civil work from different firms, each with its own hand-off.
Friction: hand-offs and delays.
Handled byTurnkey BESSToo small leaves peak charges in place. Too big leaves capacity unused.
Friction: guesswork before you buy.
Handled byIngro SIMSHeat, resting full and hard charging slowly use up capacity over the years.
Friction: capacity fading faster than planned.
Handled byIngro BrainTariffs, demand peaks, solar, DG and grid outages change hour by hour. A battery on a timer can't keep up.
Friction: the battery is empty when the peak arrives.
Handled byIngro EMSBuy any one on its own; they work best together.
From a 500 kWh factory battery to a 10 MWh grid plant.
Deployments, studies and consultancy for




















Modbus TCP and RTU, SunSpec, IEC 61850, DNP3 and OPC-UA. Runs on site with no internet, in the cloud, or both.
An engineer replies within one business day.
We map its registers and test against the hardware. Makers can be mixed in one plant.
JSW Energy: two battery makers under one controller.See the JSW plantTakes over from a locked or failing controller. Batteries and PCS stay as they are.
Tata Power-DDL: 124 PCS units moved to one Ingro controller.Smart RetrofitGrid code, dispatch order or reserve rules: written, tested and commissioned with you.
Invertis University: four cabinets, one lead and three followers.Discuss your philosophyMakers Ingro EMS works with
Tell us what your site runs and what you need: a new battery, an EMS for one you already have, or help with one that is not working. An engineer replies within one business day with what fits your site.
Ingro is an Indian energy management and battery storage company. It makes Ingro EMS and delivers battery storage end to end, from sizing to operation and maintenance.
About IngroBoth. Ingro EMS goes inside the systems that integrators and EPC contractors build, or Ingro delivers the complete battery system under one contract.
Ingro TurnkeyYes. Ingro EMS works with any make of battery, BMS, PCS and inverter. At Tata Power-DDL's 10 MW Rohini plant, Ingro replaced the original EMS and has run the plant since.
Ingro EMSYes. Ingro EMS runs your existing solar and the new battery as one plant, so surplus solar is stored instead of exported.
Ingro EMSGive Ingro SIMS twelve months of electricity bills and it recommends the solar and battery size, with the saving and payback, in minutes.
Ingro SIMSIt depends on the site, the tariff and the equipment. Ingro SIMS works out the cost, the yearly saving and the payback from your bills.
Ingro SIMSIt depends on the system size, equipment lead times and approvals. Ingro gives a timeline after reviewing your site.
Ingro TurnkeyThe Ingro Directory lists battery, inverter and PCS makers side by side, A–Z and never ranked. It is free, and Ingro is not affiliated with any of them.
Ingro Directory
Under the RERC (Green Energy Open Access) Regulations 2025, Rajasthan has raised the cap on captive solar from 100% to 200% of contract demand. A 4,000 kVA factory can now build 8,000 kW instead of 4,000 kW, but the extra headroom comes with a condition.
Read post
In RESCO and OPEX structures the project's own cashflow repays the loan, not the borrower's balance sheet. Add a battery and its performance becomes the credit case, so these deals need a file built on the project's numbers.
Read post
Most BESS proposals show the same savings for all ten years, but batteries degrade. If a loan is sized on Year 1 savings repeated for the full tenor, EMI cover in later years may be thinner than the credit note says.
Read post
Lender conversations added two questions to our pre-funding checklist: whether the file assumes a power-heavy or energy-heavy battery, and what performance data the lender will see after disbursal.
Read post